An effective incident investigation helps employers prevent repeat incidents by establishing what happened, why safety measures failed and what needs to change.
This guide explains the definition of a root cause, with workplace examples of management, planning and organisational failures. Practical steps cover assessing evidence, identifying root causes and putting corrective actions into practice.
What is the HSE definition of a root cause?
The HSE defines a root cause as “an initiating event or failing from which all other causes or failings spring”.
What are examples of root causes in health and safety?
HSE guidance explains that root causes are normally linked to management, planning or organisational failures:
- Management – directing and supervising work, providing resources and checking that safety measures are effective.
- Planning – identifying risks before work begins and deciding how to carry it out safely, including the equipment, staffing and time required.
- Organisational arrangements – deciding who is responsible for what, which procedures to follow and how safety information is shared across teams and sites.
These areas often overlap. Unclear responsibilities can lead to poor planning, while management decisions can undermine otherwise effective safety procedures.
Management failure example
Employees repeatedly report a leaking machine, but managers postpone repairs to maintain production without introducing effective temporary precautions. Someone later slips on the leaked fluid. The investigation should examine how managers prioritised the risk and decided that work could continue.
Planning failure example
A delivery is scheduled without assessing how unloading will affect pedestrian access. Employees must then walk through an area where forklift trucks are operating. The investigation should examine why safe pedestrian routes were not considered when planning the delivery.
Organisational failure example
A reported equipment defect passes between operations and maintenance because responsibility for arranging repairs is unclear. The equipment remains in use and causes an injury. The investigation should examine the arrangements for assigning, tracking and escalating repairs.
How failures can overlap
A delivery area is relocated without assessing pedestrian movements. Managers approve the move without confirming suitable precautions, and no procedure identifies who must review layout changes.
Root cause identification could reveal failures in planning the move, management approval and organisational responsibility. Each finding needs evidence showing how it contributed to the incident.
What is root cause analysis, and what does RCA mean?
RCA means root cause analysis: a structured process for establishing why an incident happened.
Investigators use root cause analysis to examine the relationships between events, working conditions and decisions, and identify where changes are needed. A timeline records what happened and in what order. Root cause analysis explains why that sequence of events was possible.
RCA can also be used after a near miss. The depth of investigation should reflect the potential consequences as well as the actual outcome. A falling load that narrowly misses someone may justify detailed analysis because of the serious injury it could have caused.
For more information, please read our guide, Root cause analysis examples in health & safety.
How do you identify the root cause of an incident?
Root cause identification helps investigators establish why an incident happened and what needs to change. The following steps guide this process:
1. Gather and preserve information
Build a record of the task, conditions and sequence of events. Collect photographs, witness accounts, equipment details and documents, including maintenance records, risk assessments and working procedures.
Act promptly to preserve information. Save CCTV before it is overwritten and record the scene before equipment is moved, where safe to do so. Obtain witness accounts while events are fresh in their memory.
2. Establish how the work was carried out
Compare written instructions with normal working practices. Speak to employees about the steps they follow, the equipment they use and any difficulties they encounter.
For example, a procedure may require a pre-use check, but some inspection points may be inaccessible. Establish whether the task can be completed safely using the time, tools and instructions provided.
3. Examine why safeguards were ineffective
Identify the precautions intended to prevent the incident. Establish whether they were missing, unsuitable, defective or bypassed, and investigate the reasons.
If a machine guard had been removed, ask whether the machine repeatedly jammed, how blockages were normally cleared and whether supervisors knew about the practice. These enquiries help explain why the safeguard was no longer protecting employees.
4. Evaluate possible explanations
Compare each explanation with the information gathered. Check for gaps, conflicting accounts and other possible causes.
Before concluding that maintenance was inadequate, establish what maintenance was required, what was completed and how any shortfall contributed to the failure. Seek technical advice where specialist knowledge is needed and distinguish confirmed findings from unresolved questions.
Is human error a root cause?
“Human error” describes an action or omission but does not explain why it occurred. An investigation should examine the factors that made the error more likely, including equipment design, instructions, workload and working conditions.
HSE’s human factors guidance advises investigators to examine the reasons behind human failures.
For example, if an employee selected the wrong valve, relevant questions include:
- Were the valves clearly labelled and easy to distinguish?
- Did the instructions match the equipment?
- Was there enough light to read the labels?
- Was the employee interrupted or working under time pressure?
- Had their competence for the task been assessed?
The answers help determine whether changes are needed to the equipment, task or working arrangements. A reminder to “take more care” would not address these factors.
Which root cause analysis methods can help?
Root cause analysis methods help investigators organise evidence and establish why an incident happened. Common methods include:
- Five Whys: asking successive “why” questions to trace how failures developed.
- Fishbone diagrams: grouping possible causes under headings such as equipment, working methods and management.
- Fault tree analysis: mapping how different failures combined to cause an incident.
Choose a method suited to the incident’s complexity and support findings with evidence. For practical examples and diagrams, please see our guide, Root cause analysis examples in health and safety.
Can an incident have more than one root cause?
Several failures can combine to cause an incident. Addressing only one may leave other factors in place that could contribute to another accident.
For example, employees may use an unsafe working method because suitable equipment is unavailable, managers have not acted on replacement requests and supervisors allow the practice to continue. The investigation should establish how each failure contributed and what needs to change.
Other weaknesses discovered during the investigation may also need action. However, they should only be recorded as root causes where evidence connects them to the incident.
What happens after a root cause is identified?
Once a root cause is identified, translate the finding into an action plan. Each action should state what will change, who is responsible, when it will be completed and how success will be checked.
Select actions that address the findings
Be specific about the improvement required. “Review maintenance” gives little direction, but “Revise the inspection schedule to include wheel fixings, using the manufacturer’s instructions” identifies a clear task.
Consider whether the same failure could affect other equipment, activities or sites. Extend the action plan where similar risks are found.
Put the changes into practice
Provide the resources and authority needed to complete each action. Where permanent improvements take time, introduce temporary precautions to control the risk.
Update relevant risk assessments and procedures and explain the changes to affected employees and contractors. Provide any instruction or training they need to follow the revised working arrangements.
Check completion and effectiveness
Check that each agreed improvement has been implemented. Assign someone to assess effectiveness after an agreed period, using employee feedback and records of faults or near misses.
For example, if an inspection form has been revised, check that employees know how to inspect the relevant components and that reported defects are addressed.
Investigate effectively. Prevent repeat incidents.
Our Incident and Accident Investigation Training covers the definition of a root cause and develops participants’ skills in gathering and analysing evidence, identifying root causes and recommending corrective actions that address failures and prevent repeat incidents.
Developed by health and safety experts, the course is available as online eLearning through our platform, SCORM delivery to your LMS, or face-to-face or virtual classroom training.
Find out more on our website or contact our friendly team on 0203 011 4242 or info@praxis42.com

Adam Clarke
Managing Director (Consulting)
