• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer
0203 011 4242   
Contact us
Praxis42 logo

Praxis42

Health and Safety eLearning Consultancy

  • About
        • Our values
        • Our Competencies
        • Careers
        • Case studies
        • Contact Us
        • Meet the team
        • Reviews
        • Terms and conditions
        • WebinarsSign up to our latest webinar or access our archive
        • BlogsAccess our latest guides, advice and industry articles
        • eLearningAccess the course library
        • ConsultingDiscover our services
        • FAQsDeveloped by experts covering key health and safety queries
  • Consulting
        • Services Overview
        • Consulting
        • Health and Safety Audits
        • Helpdesk
        • Incident Reporting Software
        • Virtual Ergonomic Assessments
        • Fire Door Inspection Service 
        • Fire Risk Assessments
        • Fire Safety Consultants
        • Risk Assessments
        • ISO 45001 Consultants
        • RAMS Review
        • Workplace Stress Assessments
        • DSE Assessment Tool
        • WebinarsSign up to our latest webinar or access our archive
        • BlogsAccess our latest guides, advice and industry articles.
        • FAQsDeveloped by experts covering key health and safety queries
        • Consulting Case Studies

          • Risk Assessment Method Statement (RAMS) – Case Study

          • Workplace Transport Risk Assessment – Case Study

          • The TFG Group – establishing a safety management system

          • Ministry of Defence – Health & safety eLearning

        • Our accreditations
        • Our reviews
  • eLearning
        • Course LibraryView our library of over 50 eLearning courses.
        • Our Digital PlatformDiscover our complete learning management system.
        • Health and Safety Courses
        • IOSH courses
        • Business Essential Courses
        • Wellbeing Courses
        • Cyber Courses
        • IOSH Managing Safely
        • Sexual Harassment Training
        • EMF and RF Awareness
        • Fire Safety Courses
        • Display Screen Equipment Awareness
        • Assessment ToolsRecord results, monitor performance and take action.
        • Bespoke trainingCourses can be tailored to your organisation’s content or branding
  • Face-to-Face Training
  • IOSH Training
        • IOSH Managing Safely
        • IOSH Managing Safely Refresher
        • IOSH Working Safely
        • IOSH Managing Safely in Construction
        • IOSH Managing Safely (US)
        • IOSH Safety for Executives and Directors
        • IOSH courses
        • Bespoke trainingCourses can be tailored to your organisation’s content or branding
  • Pricing
  • Client login

What should a legionella written scheme cover?

Microscope view of legionella bacteria in water to symbolise legionella written scheme

Adam Clarke
23rd November 2026

A legionella written scheme helps protect building users by turning risk assessment findings into clear instructions for employees and contractors. Agreed procedures, specified limits and defined responsibilities support consistent checks and maintenance to prevent legionella growth and reduce exposure.

Drawing on HSE ACOP L8, this guide explains what your written scheme should cover, when to review it and how to respond to unacceptable temperature readings or positive legionella samples. We also explain who remains accountable when contractors carry out the work and which records demonstrate that risks are being controlled.

What is a legionella written scheme?

A legionella written scheme is a document of practical instructions for controlling legionella risks in a particular water system.

The written scheme builds on the legionella risk assessment, which identifies where legionella could grow, how people could be exposed and whether existing precautions are sufficient. The scheme turns those findings into instructions for managing the risks.

Employees and contractors then use the document to understand the work required, where to record results and who to contact about problems. The instructions should reflect the water system, equipment and working arrangements at the premises.

Is a legionella written scheme a legal requirement?

Where a risk assessment identifies a foreseeable legionella risk that cannot reasonably be prevented, HSE’s Approved Code of Practice L8, which explains how to meet legal duties for controlling legionella, states that a written scheme should be used to control the risk.

The underlying duties come from sections 2–4 of the Health and Safety at Work etc. Act 1974 and COSHH regulations 6, 7 and 9, covering risk assessment, prevention or control of exposure, and maintenance of control measures.

A detailed written scheme is not necessary for every premises. ACOP L8, paragraphs 31–32 explain that further measures may be unnecessary where risks are insignificant, unlikely to increase and properly managed. However, the risk assessment should still be reviewed regularly and when circumstances change.

What should a legionella written scheme include?

A legionella written scheme should provide enough detail for tasks to be completed safely and consistently. The following areas cover the control measures and supporting arrangements described in HSE guidance, with details tailored to the system and risks identified.

1. System description and schematic diagram

A clear system description helps employees and contractors understand the water system, the equipment connected to it and normal patterns of use. An up-to-date schematic diagram should show relevant components, monitoring points and sections temporarily out of use.

Use consistent references across diagrams, instructions and records. Someone carrying out temperature checks should be able to match each outlet on the monitoring schedule to the correct location in the building.

2. Responsibilities and communication

Documented responsibilities establish who manages the controls, completes individual tasks and checks the results. Include the responsible person, deputies, employees and contractors, with clear arrangements for cover during absence.

Reporting routes should explain who receives information and who can authorise action. A contractor may complete monitoring, but a named person within the organisation should review the report and ensure outstanding recommendations are addressed.

3. Control measures and operating procedures

Practical procedures explain how to carry out the precautions identified through the risk assessment. Depending on the system, these may include temperature control, flushing, cleaning, disinfection, water treatment and maintenance.

Flushing instructions should identify the outlets, frequency, method and precautions needed to minimise exposure to water droplets. Where chemical treatment is used, include the required concentrations, contact times and safe storage, handling and disposal arrangements.

Relevant procedures should also cover commissioning, shutdown and recommissioning, including how risks will be controlled during periods of reduced use.

4. Monitoring and inspection schedule

A monitoring schedule sets out how checks will establish whether controls remain effective. Specify the locations, methods, frequencies, acceptable limits and tolerances, together with who completes the checks and interprets the results.

Temperature monitoring instructions should identify the outlets, explain how readings are taken and state the acceptable limits. Include inspections, checks on warning systems and sampling where required for the particular system.

5. Corrective and emergency actions

Corrective procedures explain what happens when monitoring identifies a problem or a control measure fails. Set out who must be notified, who investigates, what temporary precautions may be necessary and who arranges remedial work.

When a temperature reading falls outside the specified limits, employees and contractors should know how to report the result and what instructions to follow while the cause is investigated. Completion checks should establish whether corrective work has restored control.

Emergency arrangements should identify relevant contacts, access to specialist advice and the actions required for incidents such as a suspected case of Legionnaires’ disease associated with the system.

6. Records and document control

Records provide evidence that tasks were completed, results were assessed and problems received attention. Explain where information is recorded, who reviews it, how long records are retained and how employees and contractors access current instructions.

Monitoring records should identify the date, location, result and person completing the check. Where a problem requires action, link the result to the remedial work and subsequent checks so the outcome can be traced.

Document control arrangements should prevent outdated diagrams, schedules or procedures from remaining in use after changes.

7. Review arrangements

Regular reviews establish whether the written scheme remains suitable and whether the controls work in practice. Assign responsibility for reviews and specify both planned review dates and circumstances requiring an earlier assessment.

Relevant triggers include changes to the water system, building use or key personnel, repeated unacceptable results, and a suspected case associated with the system.

A review should examine monitoring records, outstanding actions and feedback from those completing the work. Changes to procedures or responsibilities should be communicated to affected employees and contractors.

What temperatures should the scheme specify?

Where temperature is used to control legionella, the written scheme should specify the temperatures to maintain, where and how readings are taken, the frequency of checks and what to do when results fall outside the limits.

For hot and cold-water systems, HSE guidance includes:

  • Hot water storage: maintain water to at least 60°C.
  • Hot water outlets: water should reach at least 50°C within one minute, or 55°C in healthcare premises.
  • Cold water storage: maintain water below 20°C.
  • Cold water outlets: water should be below 20°C within two minutes.

Check temperatures monthly at sentinel outlets, selected to monitor system performance, and check other representative outlets on a rotational basis.

Where thermostatic mixing valves reduce scalding risks, measure the hot water temperature at the valve inlet, before mixing with cold water.

Under ACOP L8, paragraph 62, the scheme should explain how unacceptable readings are reported, investigated and corrected, with follow-up checks to confirm control has been restored.

What happens if legionella is detected?

A positive legionella result should be reported promptly to the responsible person and assessed by someone competent to interpret it. The written scheme should identify who investigates, arranges remedial work and checks that control has been restored.

For hot and cold-water systems, HSE’s HSG274 Part 2, Table 2.2, recommends:

  • More than 100 and up to 1,000 cfu/l: resample where a minority of samples are positive. Repeated results require a review of the risk assessment and controls. Where most samples are positive, review immediately and consider disinfection.
  • More than 1,000 cfu/l: resample and immediately review the risk assessment and controls to identify remedial action, including possible disinfection. Following disinfection, repeat testing until satisfactory control is achieved.

Cfu/l means colony-forming units per litre.

Table 2.3 provides separate guidance for healthcare premises with susceptible patients, where any detection requires investigation. Cooling systems require the guidance in HSG274 Part 1.

The legal duty to prevent or adequately control exposure comes from COSHH regulation 7. These bacterial counts are HSE guidance action levels, not statutory limits – protective measures should reflect the risk to those using the system.

Who should manage the legionella written scheme?

The duty holder, usually the employer or person in control of the premises, is accountable for ensuring legionella risks are managed. HSE ACOP L8, paragraph 51, explains that a competent, responsible person should be appointed to oversee day-to-day control.

The responsible person needs sufficient authority, competence and knowledge of the water system. Their role includes overseeing implementation of the written scheme and monitoring whether precautions remain effective, as described in paragraphs 53 and 65.

The duty holder can fulfil this role if competent. Appointing an employee or external specialist does not remove the duty holder’s legal duties.

How long should legionella records be kept?

Records should demonstrate that controls were implemented, results were reviewed and problems were addressed. ACOP L8, paragraph 72, sets out the following retention periods:

Record typeRetention period
Risk assessment, written scheme and associated management recordsWhile current and for at least two years afterwards
Monitoring, inspection, test and check resultsAt least five years

How often should a legionella written scheme be reviewed?

Review the legionella written scheme regularly and whenever changes or monitoring results suggest that controls may no longer be effective.

HSE ACOP L8, paragraph 61, links the scheme to regular review of the risk assessment, particularly where changes could make the assessment invalid.

Set a review schedule suited to the system. Review triggers identified in ACOP L8, paragraph 47, include:

  • Changes to the water system or building use.
  • Changes to key personnel.
  • Results indicating that controls may no longer be effective.
  • New information about risks or control measures.
  • A case of Legionnaires’ disease or legionellosis associated with the system.

Missed monitoring tasks, changes to contractor responsibilities or a suspected case should also prompt a check of the arrangements.

Reviews should examine completed records, outstanding actions and feedback from those carrying out the work. Update affected instructions and share changes with employees and contractors.

Strengthen your legionella management

Our Legionella Responsible Person Training develops the knowledge and confidence to oversee risk assessments, implement a legionella written scheme and monitor water safety controls. The course explains legal duties and practical responsibilities, supporting compliance with ACOP L8 and HSG274 guidance.

Training is available through virtual classroom or face-to-face delivery and can be tailored to your organisation’s needs.

Find out more on our website or contact our friendly team on 0203 011 4242 or info@praxis42.com

Adam Clarke

Managing Director (Consulting)

Adam is Managing Director of Consulting at Praxis42. His professional experience includes work in the private and public sector, focussed on construction, facilities management, education, retail and housing. He regularly presents webinars and co-hosts our Risk. Sleep. Repeat podcast. 

     

    Primary Sidebar

    Related Page or Product

    a hand holding a tube with a red check mark and a white label which says 'legionella'

    Legionella Responsible Person Training

    Learn More

    Latest Resource

    Sexual harassment in the workplace statistics

    Sexual harassment in the workplace statistics – how widespread is it?

    Read more
    Praxis42 Consulting services

    Consulting Services

    Find out more

    Blog categories

    • Assessments
    • Compliance
    • Fire Safety Articles
    • Food Safety
    • Health and Safety
    • HR
    • Safety Management
    • Wellbeing

    Related resources

    Discover our library of expert guides, webinars and video.

    Blog
    Man on roof in PPE removing asbestos sheets

    Complete guide to asbestos sheets

    Complete guide to asbestos sheets. How to identify asbestos cement sheets, dispose of asbestos sheets safely and comply with legislation.
    Read more

    What is the definition of a root cause in health and safety?

    How to carry out an individual risk assessment

    The purpose of a risk assessment: an employer’s guide

    Footer

    About

    We're the leading compliance organisation trusted by businesses nationwide to meet their auditing, assessment and training needs. We work with all sectors and size of organisation. We have extensive certification and decades of safety management experience.


    Company no. 04152524 · VAT no. 770517529

    Explore Praxis42

    • Home
    • About
    0203 011 4242   info [at] praxis42 [dot] com

    © 2026 Praxis42 Privacy Policy Terms and Conditions